48.2 (90)
Use provision 52.248-9000, Evaluation of Offers Using Alternate Value Engineering Change Proposals (VECPs) Method, in solicitations whenever an accepted VECP is incorporated into a solicitation as one of two or more alternate methods.
48.2 (91)
Use clause 52.248-9001, Exemption from Value Engineering, in solicitations and contracts that include first article testing requirements and FAR 52.248-1 Alternate III, Value Engineering, is also present.
48.2 (92)
Use clause 52.248-9002, Offers Using Alternate Value Engineering Change Proposals (VECPs) Method and Specifications/Drawings, when provision 52.248-9000 was included and the offeror indicates he will be using both the specification/drawing method and the alternative VECP method.