(b) Contracting personnel shall incorporate quality assurance requirements communicated to them by the local quality assurance personnel in solicitations and contracts. In the event a change to any of these requirements is determined to be in the best interest of the Government, contracting personnel will coordinate with the quality element before changing the requirements. Justification for such a change shall be documented in the official contract file or be clearly prescribed in coordinated local procedures. For example, a local procedure may specify that the contracting element can unilaterally change the place of inspection from destination to source, whereas source inspection cannot be changed to destination inspection without referring the matter to the quality element for coordination.
(c) With few exceptions, the activity responsible for technical requirements (e.g., specifications, drawings, and standards) is the applicable military component. The quality/technical element at the DLA buying activity, or the functional expert within the Commodity Business Unit (CBU) (or similar structure), is responsible for receiving these requirements from the Services and transmitting or preparing applicable inspection instructions to the DSC contracting officer for inclusion in contracts.
(90) [RESERVED]
(91) Contract Data Package Recommendation/Deficiency Report (DD Form 1716).
(1) Chiefs of the contracting office will designate a single control point with the responsibility to receive, analyze, maintain control, and assure timely resolution of recommended changes to Contract Data Package(s) (CDPs).
(2) Recommended improvements/reported deficiencies in CDPs are usually submitted on DD Form 1716, Contract Data Package Recommendation/Deficiency Report, but may be received via messages or letter, which are to be processed as though they were submitted on a DD Form 1716.
(3)(i) DD Forms 1716 will be logged in by the control point. The log will contain, as a minimum, the following information:
(A) Date logged in;
(B) Control number assigned by submitting activity;
(C) Contracting officer assigned;
(D) Submitting activity;
(E) Originator's required suspense;
(F) Category of CDP problem;
(G) Date required actions completed;
(H) Date logged out.
(ii) The control point will establish a suspense date based on the priority noted in box 5, DD Form 1716.
(iii) The DD Form 1716 will be forwarded for evaluation to the contracting officer having cognizance over the affected contract.
(4) (i) The contracting officer will refer the DD Form 1716 to other technical areas if additional expertise is required. The contracting officer is also responsible for coordination with the technical operations element if contact is required with Service users, engineering support activities (ESAs), or specification preparing activities.
(ii) If it is determined that the recommended improvement/reported deficiency is significant, and delivery and payment have not been completed, action will be taken to modify the current contract. If the recommended improvement/ reported deficiency is insignificant, action will be taken only on future contracts.
(iii) When requested by the submitter of the DD Form 1716, the contracting officer will furnish a reply which states the action to be taken or the rationale for no action. When actions cannot be completed by the suspense date established in accordance with subparagraph (3)(ii) above, the contracting officer will use a DLA Form 65-R (Notification Form), or equivalent, to notify both the submitter and the control point of the revised completion date.
(iv) When all appropriate actions have been completed, the contracting officer will return the completed DD Form 1716 and any necessary documentation to the control point.
(5) The control point will review the completed DD Form 1716 package to determine if all required actions have been completed and if the corrective action developed, or justification for continuing existing requirements, is appropriate. If the response is determined to be appropriate, the log will be so annotated; if additional actions are required, the package, with rationale for additional required actions, will be returned to the contracting officer.
(6) As a means of identifying trends in recommended improvements/reported deficiencies, the control point will review the log on a quarterly basis. Trend data will be forwarded to the contracting office's policy, plans, and/or programs element in order to assist management in focusing on those areas where procedures have not been followed, contract deficiencies have been noted, or repetitive situations have occurred which necessitate further investigation.