(a)(1) The SBA notification, if required (see DFARS 219.804-2(2)), shall be provided in writing through the SBS and a copy provided to the local SBA PCR. If no response is received from SBA by the applicable due date, (i.e., within 10 working days of receipt of the offering in accordance with FAR 19.804-3(a) or within 5 working days of receipt in accordance with DFARS 219.804-3), the requirement may be withdrawn or the time extended at the option of the contracting office.