Section 5417.9002: Conditions for use.

(a) The conditions for use of multisource contracting for the purposes or reasons described in 17.9001(a)(1) and (a)(2) above are described in FAR 6.202 and 6.302-3, respectively.

(b) Multisource contracting may be used when it is necessary for the purpose of testing under contract, the adequacy and practicability of specifications for a new or modified item to assure that the specification will permit quantity or mass production of quality items within economical production practices, and that the specification does not restrict competition.

    (c) When the otherwise low, responsive or technically acceptable offer is from a prospective contractor that cannot be determined to be responsible for the entire quantity on which it offered, award may be made to that offeror only for the portion of the total requirements for which the offeror can be determined responsible. In such cases, the contracting officer may award the balance of the total requirements or that portion of the balance of the total requirements to the next low, responsive or technically acceptable offeror(s) to the extent that such offeror(s) is determined to be responsible, provided that the terms and conditions of the solicitation do not limit the Government's right to make multiple awards and the prospective contractor(s)does not condition its offer to preclude such awards. (Note that when the provision at FAR 52.214-10, Contract Award - Sealed Bidding, is included in IFBs, as required by FAR 14.201-6(e) (2), the Government has the right to award less than the total quantity solicited. Bids that take exception to this provision are not responsive. When the provision at FAR 52.215-1, Instructions to Offerors - Competitive Acquisition, is included in RFPs, as required by FAR 15.407(d)(4), 15.209 the Government has the right to award less than the total quantity solicited. Offers that take exception to this provision are not technically acceptable.)

(d) Provision for making multiple awards may be made to ensure the availability of supplies in business risk situations. A reasonable basis for making multiple awards in such situations must exist, for example, the record shows a history of poor performance (unrelated to Government caused delay) for a critical item due to a contractors’ or inadequate production capacity; or the specification is complex or difficult and requirements must be satisfied in a relatively constrained timeframe. To adequately justify making multiple awards in such cases, the contracting officer must demonstrate that awarding less than the total requirements to more than one source will aid in ensuring that the prior contractor performance problems will not recur. Further, the benefits of having more than one source under contract for the same supplies or services at the same time should outweigh any anticipated increased prices that result from the award of more than one contract.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347