Reference

More Resources

 

Section 5409.106-4: Reports.

(a) Refer to on-site procedures for actions required when a negative preaward survey report is received.

(b) When a Contracting Officer's determination of contractor responsibility is inconsistent with the recommendation in the preaward survey report, the rationale shall be documented in the contract file. This decision shall be reviewed and approved in accordance with on-site procedures. The Preaward Survey Monitor shall advise the surveying facility of the Contracting Officer's decision.

(c) Acquisition Specialists (preaward) shall document the procurement file and ensure all documents are scanned into the electronic contract file (ECF).




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347