Reference

More Resources

 

Section 5352.235-9003: Application for Equipment Frequency Authorization.

As prescribed in 5335.071(90), insert the following clause, substantially as written, in Section I:

APPLICATION FOR EQUIPMENT FREQUENCY AUTHORIZATION (AFMC) (OCT 2008)

The Contractor must ensure that radio frequencies are available to support electromagnetic radiating devices in their intended environment and that adequate protection from interference can be provided to receiving devices. Accordingly, the Contractor shall submit DD Form 1494, Application for Equipment Frequency Allocation, in triplicate to the buyer at the issuing office indicated on the cover of this document within 45 days after contract award. Instructions for preparing the form are contained in AFI 33-118, Radio Frequency Spectrum Management, and on the form itself. The DD Form 1494 will be routed through the Administrative Activity Quality Control Office indicated on the cover of the form in accordance with AFI 33-118. Upon verification of frequency requirements, the Contractor shall submit, if required, information to prepare a "Standard Frequency Action Format (SFAF) Request" to the person and address specified above. Instructions for preparing an SFAF are contained in AFI 33-118. Attention is directed to DFARS 252.235-7003, Frequency Authorization.

(End of clause)




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347