As prescribed in 5331.109(h)(4)(90)(e), insert a clause, substantially as written, in Section I:
PRE-CONTRACT COSTS (AFMC) (NOV 2007)
All costs up to (insert dollar limitation) incurred by the Contractor after (insert date) directly related to the negotiation and before the effective date of this contract, will be recognized to the same extent as if incurred after the effective contract date.
(End of Clause)