As prescribed in 5311.304-90(d)(2), insert the following clause, substantially as written, in Section E:
ACCEPTABLE NEW AND RECONDITIONED SURPLUS MATERIAL (AFMC) (OCT 2008)
New and reconditioned material is acceptable provided it has never been installed or used. It shows no signs of rust, corrosion, or other deterioration due to age or improper packaging/preservation. Reconditioning is allowed to the extent that gaskets, seals, O-rings, or other such cure-dated items have been or will be replaced prior to use in accordance with the applicable technical specifications. This statement applies to (insert contract line item(s)).
(End of clause)