Reference

More Resources

 

Section 5133.190-1: Bid protest action report.

Within 15 calendar days following notification of resolution of a GAO protest, the contracting officer must send a bid protest action report in the format in 5153.9006 (double spaced between item numbers) to the following addressees:

    (a) AMC contracting activities: Addressee in 5101.290(b)(9).

    (b) USACE contracting activities: U.S. Army Corps of Engineers, Attn: CECC-C, 441 G St., N.W., Washington, DC 20314-1000. [AFARS Revision #004, dated July 26, 2002]

    (c) All other contracting activities: Addressee in 5133.104(a)(4)(S-90)(1)(iii).

[AFARS Revision #21, dated May 22, 2007]




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347