Subpart 2009.4: Debarment, Suspension, and Ineligibility
Section 2009.405-1: Continuation of current contracts.
The Head of the Contracting Activity is authorized to make the determination to continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, or proposed for debarment in accordance with FAR 9.405-1.
Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347
Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347