Section 1845.7210-1: Utilization surveys.


The property administrator is responsible for ensuring that the contractor has effective procedures for evaluating Government property utilization. However, when necessary, the contract administration office shall provide specialists qualified to perform the technical portion of utilization surveys to assist the property administrator in determining the adequacy of these procedures.
(b) Upon assignment of an initial contract under which Government-owned plant equipment in particular will be provided to a contractor, the property administrator shall ensure that the contractor has established effective procedures and techniques for controlling its utilization. The property administrator, with the assistance of technical specialists, if necessary, shall evaluate these procedures. A record of the evaluation shall be prepared and become a part of the property administration file. If the procedures are determined inadequate, the record shall identify the deficiencies and the corrective actions necessary. If the deficiencies are not corrected by the contractor, the property administrator shall promptly refer the matter to the contracting officer.
(c) The property administrator shall perform annual surveys of the contractor's procedures related to utilization of Government-owned plant equipment. At contractor facilities having a substantial quantity of plant equipment, the surveys should normally be
conducted on a continual basis, reviewing equipment utilization records and physically observing a group of preselected items during each portion of the survey. Surveys shall be conducted to the degree determined necessary, considering the findings of prior surveys and the contractor's performance history in identifying and declaring equipment excess to authorized requirements. The contractor shall be required to justify, by specific Government programs, the retention of all Government-owned plant equipment. The property administrator shall make maximum use of contractor's machine loading data, order boards, production planning records, machine time records, and other production control methods.
(d) The property administrator shall conduct a special survey when a significant change occurs in the contractor's production schedules, such as a termination, completion of a contract, or a major adjustment in a program. Special surveys may be limited to a given department, activity, or division of a contractor's operation.
(e) In the absence of adequate justification for retention, the contractor shall identify and report Government-owned plant equipment in accordance with FAR 45.502(g) and 45.509-2(b)(4). Items that are part of approved inactive package plants or standby lines are exempted from utilization surveys. The contracting officer shall ascertain periodically whether existing authorizations for standby or lay-away requirements are current.