|
|
|
Section 1843.7005: Definitization.
(a) Undefinitized contract actions should be sufficiently complete and detailed as to enable the contractor to begin immediate preparation of a cost proposal for the changed requirement. The NASA goal is to definitize UCAs within 180 days from date of issuance.
(b) Whenever possible, pre-change study efforts or engineering change proposals (ECPs) shall be utilized to negotiate and definitize changes prior to issuance.
Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347
Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347
| |