Reference

More Resources

 

Section 1842.1502: Policy.


(a) Within 60 days of every anniversary of the award of a contract having a term exceeding one year, contracting officers must conduct interim evaluations of performance on contracts subject to FAR Subpart 42.15 and this subpart. Interim evaluations are not required on contracts whose award anniversary is within 3 months of the end of the contract period of performance. The final evaluation will include an evaluation of the period between the last interim evaluation and the end of the contract period of performance. Interim performance evaluations are optional for SBIR/STTR Phase II contracts. A final evaluation summarizing all performance must be conducted on all contracts.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347