Section 1836.203: Government estimate of construction costs.


(c)(i) If the acquisition is by sealed bidding, the contracting officer shall file a sealed copy of the detailed Government estimate with the bids until bid opening. After the bids are read and recorded, the contracting officer shall read the estimate, and record it in the same detail as the bids.
(ii) If the acquisition is by negotiation, the contracting officer may disclose the overall amount of the Government estimate after award upon request of offerors.

1836.209 Construction contracts with architect-engineer firms.
(1) Except as indicated in paragraph (2) of this section, the Assistant Administrator for Procurement (Code HS) is the approval authority.
(2) A construction contract may be awarded to the firm that designed the project (or its subsidiaries or affiliates) if the contract is awarded on the basis of performance specifications for the construction of a facility, and it requires the contractor to furnish construction drawings, specifications, or site adaptation drawings of the facility.
(3) In no case shall the firm that prepared the drawings and specifications supervise and inspect, on behalf of the Government, the construction of the facility involved.