Section 1830.7001-2: DD Form 1861 completion instructions.
(a) List overhead pools and direct-charging services centers (if used) in the same structure as they appear on the contractor’s cost proposal and Form CASB-CMF. The structure and allocation base units-of-measure must be compatible on all three displays.
(b) Extract appropriate contract overhead allocation base data, by year, from the evaluated cost breakdown or prenegotiation cost objective, and list them against each overhead pool and direct-charging service center.
(c) Multiply each allocation base by its corresponding cost of money factor to compute the FCCOM estimated to be incurred each year. The sum of these products represents the estimated contract FCCOM for that year’s effort.
(d) Add the yearly estimates to calculate the total contract FCCOM.
Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347
Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347
| |