Section 1815.406-3: Documenting the negotiation.


(a)(i) The price negotiation memorandum (PNM) serves as a detailed summary of: the technical, business, contractual, pricing (including price reasonableness), and other elements of the contract negotiated; and the methodology and rationale used in arriving at the final negotiated agreement.
(ii) A PNM is not required for a contract awarded under competitive negotiated procedures. However, the information required by FAR 15.406-3 shall be reflected in the evaluation and selection documentation to the extent applicable.
(iii) When the PNM is a "stand-alone" document, it shall contain the information required by the FAR and NFS for both PPMs and PNMs. However, when a PPM has been prepared under 1815.406-1, the subsequent PNM need only provide any information required by FAR 15.406-3 that was not provided in the PPM, as well as any changes in the status of factors affecting cost elements (e.g., use of different rates, hours, or subcontractors; wage rate determinations; or the current status of the contractor's systems).
(b) When field pricing assistance has been obtained from the Defense Contract Audit Agency, the contracting officer shall send a copy of the PNM documentation to the audit office that provided the assistance.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347