Reference

More Resources

 

Section 1815.404-471-1: General.


(a) The structured approach for determining profit or fee objectives (NF 634) focuses on three profit factors:
(1) Performance risk;
(2) Contract type risk including working capital adjustment; and
(3) Other Considerations which may be considered by the contracting officer to account for special circumstances that are not adequately addressed in the performance risk and contract type risk factors.
(b) The contracting officer assigns values to each profit or fee factor; the value multiplied by the base results in the profit/fee objective for that factor. Each factor has a normal value and a designated range of values. The normal value is representative of average conditions on the prospective contract when compared to all goods and services acquired by NASA. The designated range provides values based on above normal or below normal conditions. Values outside the designated range must not be used. In the negotiation documentation, the contracting officer need not explain assignment of the normal value, but must address conditions that justify assignment of other than the normal value.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347