(a) Each proposal shall be evaluated to identify and document:
(i) Any deficiencies;
(ii) All strengths and weaknesses. These findings will include a description of how each strength and weakness will impact performance in terms of benefit or risk statements;
(iii) The numerical score and/or adjectival rating of each Mission Suitability subfactor, if applicable;
(iv) Cost realism, if appropriate;
(v) The Past Performance evaluation factor; and
(vi) Any programmatic risk to mission success, e.g., technical, schedule, cost, safety, occupational health, security, export control, or environmental. Risks may result from the offeror's technical approach, manufacturing plan, selection of materials, processes, equipment, or as a result of the cost, schedule, and performance impacts associated with its approach. Risk evaluations must consider the probability of the risk occurring, the impact and severity of the risk, the timeframe when the risk should be addressed, and the alternatives available to meet the requirements. Risk assessments shall be captured as part of strengths, weaknesses, deficiencies, and numerical or adjectival ratings. Identified risks and the potential for cost impact shall be considered in the cost or price evaluation.
(a)(1) Cost or price evaluation.
(A) Cost or pricing data shall not be requested in competitive acquisitions. See 1815.403-1(b)(1) and 1815.403-3(b).
(B) When contracting on a basis other than firm-fixed-price, the contracting officer shall perform price and cost realism analyses to assess the reasonableness and realism of the proposed costs. A cost realism analysis will determine if the costs in an offeror's proposal are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the various elements of the offeror's technical proposal. The analysis should include:
(a) The probable cost to the Government of each proposal, including any recommended additions or reductions in materials, equipment, labor hours, direct rates, and indirect rates. The probable cost should reflect the best estimate of the cost of any contract which might result from that offeror's proposal.
(b) The differences in business methods, operating procedures, and practices as they affect cost.
(c) A level of confidence in the probable cost assessment for each proposal.
(a)(2) Past performance evaluation.
(A) The Past Performance evaluation assesses the contractor's performance under previously awarded contracts. The past performance evaluation shall be in accordance with FAR 15.305(a)(2) and this section. When applying the definitions below to arrive at a confidence rating, the SEB’s evaluation shall clearly document each Offeror’s relevant past performance (e.g. currency/recency, size, content and complexity) to assess the Offeror’s overall confidence rating assigned. The past performance evaluation is an assessment of the Government’s confidence in the offeror’s ability to perform the solicitation requirements. Past Performance shall be evaluated for each offeror using the following levels of confidence ratings:

Very High Level of Confidence
The Offeor’s relevant past performance is of exceptional merit and is very highly pertinent to this acquisition; indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance. Based on the Offeror’s performance record, there is a very high level of confidence that the Offeror will successfully perform the required effort. ** (One or more significant strengths exist. No significant weaknesses exist. )

High Level of Confidence
The Offeror’s relevant past performance is highly pertinent to this acquisition; demonstrating very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance. Based on the Offeror’s performance record, there is a high level of confidence that the Offeror will successfully perform the required effort. ** (One or more significant strengths exist. Strengths outbalance any weakness.)

Moderate Level of Confidence
The Offeror’s relevant past performance is pertinent to this acquisition, and it demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance. Based on the Offeror’s performance record, there is a moderate level of confidence that the Offeror will successfully perform the required effort. ** (There may be strengths or weaknesses, or both.)

Low Level of Confidence
The Offeror’s relevant past performance is at least somewhat pertinent to this acquisition, and it meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance. Based on the Offeror’s performance record, there is a low level of confidence that the Offeror will successfully perform the required effort. Changes to the Offeror’s existing processes may be necessary in order to achieve contract requirements. ** (One or more weaknesses exist. Weaknesses outbalance strengths.)

Very Low Level of Confidence
The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance. Based on the Offeror’s performance record, there is a very low level of confidence that the Offeror will successfully perform the required effort. ** (One or more deficiencies or significant weaknesses exist.)

Neutral
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance [see FAR 15.305(a) (2) (ii) and (iv)].

** (At the Installations’ discretion strengths and weaknesses may be assigned.)

(B) The evaluation may be limited to specific areas of past performance considered most germane for the instant acquisition. It may include any or all of the items listed in FAR 42.1501, and/or any other aspects of past performance considered pertinent to the solicitation requirements or challenges. Regardless of the areas of past performance selected for evaluation, the same areas shall be evaluated for all offerors in that acquisition.
(C) Questionnaires and interviews may be used to solicit assessments of the offeror's performance, as either a prime or subcontractor, from the offeror's previous customers.
(D) All pertinent information, including customer assessments and any offeror rebuttals, will be made part of the source selection records and addressed in the evaluation of past performance.
(a)(3) Technical Evaluation.
(A) Mission Suitability subfactors shall be evaluated using the following adjectival ratings, definitions, and percentile ranges.

ADJECTIVAL RATING

DEFINITIONS

PERCENTILE RANGE

Excellent

A comprehensive and thorough proposal of exceptional merit with one or more significant strengths. No deficiency or significant weakness exists.

91-100

Very Good

A proposal having no deficiency and which demonstrates over-all competence. One or more significant strengths have been found, and strengths outbalance any weaknesses that exist.

71-90

Good

A proposal having no deficiency and which shows a reasonably sound response. There may be strengths or weaknesses, or both. As a whole, weaknesses not off-set by strengths do not significantly detract from the offeror’s response.

51-70

Fair

A proposal having no deficiency and which has one or more weaknesses. Weaknesses outbalance any strengths.

31-50

Poor

A proposal that has one or more deficiencies or significant weaknesses that demonstrate a lack of overall competence or would require a major proposal revision to correct.

0-30

(B) When contracting on a cost reimbursement basis, a cost realism analysis shall be performed consistent with FAR 15.404-1(d).
(a)(4) The cost or price evaluation, specifically the cost realism analysis, often requires a technical evaluation of proposed costs. Contracting officers may provide technical evaluators a copy of the cost volume or relevant information from it to use in the analysis.
(b) The contracting officer is authorized to make the determination to reject all proposals received in response to a solicitation.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347