Reference

More Resources

 

Section 1552.211-77: Final reports.

As prescribed in 1511.011-77, insert this contract clause when a contract requires a draft and a final report.

Final Reports (APR 1984)

(a) “Draft Report”-The Contractor shall submit to the Project Officer __ copies of the draft final report on or before __ (date) __ The Contractor shall furnish to the Contracting Officer a copy of the letter transmitting the draft. The draft shall be typed double-spaced or space-and-a-half and shall include all pertinent material required in the final report. The Government will review for approval or disapproval the draft and provide a response to the Contractor within __ calendar days after receipt. If the Government does not provide a response within the allotted review time, the Contractor immediately shall notify the Contracting Officer in writing.

(b) “Final Report”-The Contractor shall deliver a final report on or before the last day of the period of performance specified in the contract. Distribution is as follows:

------------------------------------------------------------------------

No. of copies Addressee

------------------------------------------------------------------------

1..................................... EPA Library.

1..................................... Contracting Officer.

1..................................... Project Officer.

------------------------------------------------------------------------

(End of clause)

[49 FR 8867, Mar. 8, 1984. Redesignated at 55 FR 39622, Sept. 28, 1990, as amended at 60 FR 21994, May 4, 1995. Redesignated at 61 FR 57339, Nov. 6, 1996, as amended at 62 FR 33573, June 20, 1997]




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347