Section 1552.209-76: Contractor performance evaluations.

As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts.

Contractor Performance Evaluations (OCT 2002)

The contracting officer shall complete a Contractor Performance Report (Report) within ninety (90) business days after the end of each 12 months of contract performance (interim Report) or after the last 12 months (or less) of contract performance (final Report) in accordance with EPAAR 1509.170-5. The contractor shall be evaluated based on the following ratings: 0 = Unsatisfactory, 1 = Poor, 2 = Fair, 3 = Good, 4 = Excellent, 5 = Outstanding, N/A = Not Applicable.

The contractor may be evaluated based on the following performance categories: Quality, Cost Control, Timeliness of Performance, Business Relations, Compliance with Labor Standards, Compliance with Safety Standards, and Meeting Small Disadvantaged Business Subcontracting Requirements.

(a) The contracting officer shall initiate the process for completing interim Reports within five (5) business days after the end of each 12 months of contract performance by requesting the project officer to evaluate contractor performance for the interim Report. In addition, the contracting officer shall initiate the process for completing final Reports within five (5) business days after the last 12 months (or less) of contract performance by requesting the project officer to evaluate contractor performance for the final Report. The final Report shall cover the last 12 months (or less) of contract performance. Within thirty (30) business days after the project officer receives a request from the contracting officer to complete an evaluation, the project officer shall:

(1) Complete a description of the contract requirements;

(2) Evaluate contractor performance and assign a rating for quality, cost control, timeliness of performance, compliance with labor standards, and compliance with safety standards performance categories (including a narrative for each rating);

(3) Provide any information regarding subcontracts, key personnel, and customer satisfaction;

(4) Assign a recommended rating for the business relations performance category (including a narrative for the rating); and

(5) Provide additional information appropriate for the evaluation or future evaluations.

(b) The contracting officer shall:

(1) Ensure the accuracy of the project officer's evaluation by verifying that the information in the contract file corresponds with the designated project officer's ratings;

(2) Assign a rating for the business relations and meeting small disadvantaged business subcontracting requirements performance categories (including a narrative for each rating).

(3) Concur with or revise the project officer's ratings after consultation with the project officer;

(4) Provide any additional information concerning the quality, cost control, timeliness of performance, compliance with labor standards, and compliance with safety standards performance categories if deemed appropriate for the evaluation or future evaluations (if any), and provide any information regarding subcontracts, key personnel, and customer satisfaction; and

(5) Forward the Report to the contractor within ten (10) business days after the contracting officer receives the project officer's evaluation.

(c) The contractor shall be granted thirty (30) business days from the date of the contractor's receipt of the Report to review and provide a response to the contracting officer regarding the contents of the Report. The contractor shall:

(1) Review the Report;

(2) Provide a response (if any) to the contracting officer on company letter head or electronically;

(3) Complete contractor representation information; and

(4) Forward the Report to the contracting officer within the designated thirty (30) business days.

(d) The contractor's response to the Report may include written comments, rebuttals (disagreements), or additional information. If the contractor does not respond to the Report within the designated thirty (30) business days, the specified ratings in the Report are deemed appropriate for the evaluation period. In this instance, the contracting officer shall complete the Agency review and sign the Report within three (3) business days after expiration of the specified 30 business days.

(e) If the contractor submits comments, rebuttals (disagreements), or additional information to the contracting officer which contests the ratings, the contracting officer, in consultation with the project officer, shall initially try to resolve the disagreement(s) with the contractor.

(f) If the disagreement(s) is (are) not resolved between the contractor and the contracting officer, the contracting officer shall provide a written recommendation to one level above the contracting officer for resolution as promptly as possible, but no later than five (5) business days after the contracting officer is made aware that the disagreement(s) has (have) not been resolved with the contractor. The individual who is one level above the contracting officer shall:

(1) Review the contracting officer's written recommendation; and

(2) Provide a written determination to the contracting officer for summary ratings (ultimate conclusion for ratings pertaining to the performance period being evaluated) within five (5) business days after the individual one level above the contracting officer receives the contracting officer's written recommendation.

(g) If the disagreement is resolved, the contracting officer shall complete the Agency review and sign the Report within three (3) business days after consultation.

(h) The contracting officer shall complete the Agency review and sign the Report within three (3) business days after the contracting officer receives a written determination for summary ratings from one level above the contracting officer.

(i) An interim or final Report is considered completed after the contracting officer signs the Report. The contracting officer must provide a copy of completed Reports (interim and final) to the contractor within two (2) business days after completion.

[64 FR 20204, Apr. 26, 1999, as amended at 67 FR 66344, Oct. 31, 2002]