Reference

More Resources

 

Section 1536.209: Construction contracts with architect-engineer firms.

(a) The provisions of FAR 36.209 do not apply to subcontractors performing treatability studies.

(b) The provisions of FAR 36.209 also do not apply to subcontractors whose input during the design phase does not substantially affect the course of the design work.

(c) Approval under FAR 36.209 is not required for subcontractors under paragraph (a) or (b) of this section. Approval for all other subcontractors and prime contractors may be granted by the CCO. In reviewing requests for approval, the RAD shall consider factors such as the availability of other firms to perform the necessary construction or Superfund remedial action work, the estimated cost to the Government, and the policy of the Agency to promote the use of innovative technology.

[55 FR 49283, Nov. 27, 1990, as amended at 59 FR 18977, Apr. 21, 1994]




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347