Subpart 1422.4: Labor Standards for Contracts Involving Construction
Section 1422.404-6: Modifications of wage determinations.
The HCA is authorized to request an extension for awards not made within 90 days after bid opening.
Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347
Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347