Reference

More Resources

 

Section 1341.201: Policy.

The designee authorized to enter into a contract pursuant to 42 U.S.C. 8287 (regarding shared energy savings, including cogeneration) is set forth in CAM 1301.70.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347