Reference

More Resources

 

Section 515.404-4: Profit.

(a) Structured approach for determining profit or fee objectives. Base the analysis of profit factors on information available to the Government before negotiations. Obtain such information from proposals, audit data, performance reports, preaward surveys and the like. The structured approach helps establish a profit objective. It also provides a basis for documenting the objective, including an explanation of any significant departure from this objective in reaching a final agreement. Prepare documentation commensurate with the dollar value and complexity of the proposed procurement.

(b) Exemptions from requirement to use the structured approach.

    (1) The following types of procurements are exempt from the structured approach:

      (i) Management contracts for operation and/or maintenance of Government facilities.

      (ii) Contracts primarily requiring delivery of material supplied by subcontractors.

      (iii) Termination settlements.

      (iv) Cost-plus-award-fee contracts.

      (v) Contracts and contract modifications of $100,000 or less in value.

      (vi) Architect-engineer and construction contracts.

    (2) You may request exemptions for other contracts having unusual pricing situations where you determine the structured approach is unsuitable. Document your justification in writing. The HCA must approve all such exemptions.

(c) Other methods for exempted procurements. Under exempted procurements, you may use other methods for establishing profit objectives. In general, use methods supported in a manner similar to the structured approach (profit factor breakdown and documentation of profit objective). Exclude factors within the structured approach that do not apply to the procurement.

(d) Profit-analysis factors. Consider the following factors when you negotiate profit. Use the weight ranges listed after each factor when you use the structured approach.

Profit Factors

Weight Ranges in Percent

Contractor Effort

Material acquisition

1 to 4

Conversion direct labor

4 to 12

Conversion related indirect cost:

Other costs

General management

1 to 3

2 to 5

Other Factors

Contract cost risk

0 to 7

Capital investments

-2 to +2

Federal socioeconomic programs

-.5 to +.5

Cost-control and other past accomplishments

-2 to +2

Independent development and additional factors

-2 to +2

(e) GSA Form 1766. You may use GSA Form 1766, Structured Approach Profit/Fee Objective, to help compute the profit objective. Measure the Contractor Effort by assigning a profit percentage within the designated weight ranges to each element of cost recognized.

(f) Facilities capital cost of money. If you allow facilities capital cost of money as an item of cost, either as a part of your price/cost objective in a firm fixed price type contract or as an allowable cost in a flexibly priced type contract, e.g., cost reimbursement or fixed price incentive type contract, reduce the profit/fee objective as follows. After you develop a dollar profit/fee amount for the requirement, subtract from that aggregate dollar profit/fee amount any dollar amount allowed for facilities capital cost of money. The remainder is the profit/fee objective.

(g) Calculating profit dollars. After computing a total dollar profit for Contractor Effort, calculate the specific profit dollars for the categories under Other Factors. Do this by multiplying the total Government cost objective, excluding any cost of money for facilities capital, by the specific weights assigned to the elements in Other Factors.

(h) Common factors. In determining the value of each factor, consider the definition, description, and purpose of the factors prescribed in FAR 15.404-4(d) and this subsection.

    (1) General management. Management problems surface in various degrees. Consider the management expertise exercised to solve them as an element of profit. For example, a new program for an item that involves advanced state of the art techniques may involve more problems and require more managerial time and abilities of a higher order than a follow-on contract. If an initial contract creates more problems and merits a higher profit weight, then a follow-on should merit a downward adjustment, as many of the problems should have been solved. Evaluate the underlying managerial effort involved on a case-by-case basis.

    (2) Other costs. Include all other direct costs of contractor performance under this item (e.g., travel and relocation, direct support, and consultants). When you analyze these costs, consider:

      (i) Their significance.

      (ii) Their nature.

      (iii) How much they contribute to contract performance.

    (3) Contract cost risk. When you select the proper contract type, the reward for risk by contract type will usually fall into the ranges below.

      (i) Cost-reimbursement type contracts. 0-3 percent. A cost-plus-a-fixed-fee contract does not normally justify a reward for risk in excess of 0 percent. Only a contract that contains cost risk features such as ceilings on overhead might merit a higher weight. Such cases may justify up to 1 percent. Cost-plus-incentive-fee contracts fill the remaining portion of the 0 to 3 percent range. For these, assign weightings based on such factors as confidence in target cost, share ratio of fee(s), etc.

      (ii) Fixed-price type contracts. 3-7 percent. This weight range is wide enough to accommodate the many types of fixed-price arrangements. Assign weightings based on the cost risk assumed. Only firm fixed-price contracts should reach the top end of the range.

      (iii) Subcontracting program. The contractor’s subcontracting program may significantly impact the contractor’s risk under a contract. It could affect risk in terms of both cost and performance. Consider this in selecting a weight for cost risk. The prime contractor may effectively transfer cost risk to a subcontractor. This merits a risk evaluation below the range that would otherwise apply for the contract type proposed. However, you should not evaluate risk lower when a substantial portion of the contract cost represents subcontracts, but without any substantial transfer of contractor’s risk.

      (iv) Definitizing letter contracts, unpriced change orders, and unpriced orders under basic ordering agreements. Consider the effect on risk as a result of partial performance before definitization. Some circumstances may effectively reduce the contractor’s total risk, while others may have no effect. Determine an equitable profit weight for all recognized costs, both those incurred and future costs. Consider all attendant circumstances, not just the portion of costs incurred or percentage of work completed before definitization.

      (v) Service contracts. Apply a weight range of 0 to 4 percent for cost risk. A firm fixed-price contract, not priced on a labor-hour method, may warrant high consideration for contractor cost risk. It may merit a weight up to 4 percent. Conversely, a cost-plus-fixed-fee service contract normally warrants a zero cost risk factor.

    (4) Capital investments. In evaluating this factor for profit weights, consider the following:

      (i) Facilities.

        (A) To evaluate how this factor contributes to the profit objective, you need to know the level of facilities use needed for contract performance, the source of financing for the facilities, and the overall cost effectiveness of the facilities offered.

        (B) Contractors who furnish their own facilities that significantly contribute to lower total contract costs, warrant additional profit. Contractors who rely on the Government to provide or finance facilities warrant less profit. Evaluate situations between the above examples on their merits and make either a positive or negative profit weight adjustment, as appropriate.

        (C) You do not need to adjust the profit when a contractor who owns a large quantity of facilities will perform a contract that does not benefit from these facilities, or when a contractor’s use of its facilities has a minimum cost impact on the contract.

      (ii) Payments. Consider the frequency of payments by the Government to the contractor. Assess the impact the contract will have on the contractor’s cash flow. Generally, payments more frequent than monthly merit negative consideration, with maximum reduction as the contractor’s working capital approaches zero. Payments less frequent than monthly merit positive consideration, with additional consideration for payments less frequent than the contractor’s or the industry’s normal practice.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347