Reference

More Resources

 

Section 315.307: Proposal revisions.

(b) Final proposal revisions are subject to-

(1) A final evaluation of price or cost and other salient factors by the Contracting Officer and Project Officer, with assistance from a cost/price analyst, as appropriate; and

(2) An evaluation of technical factors by the technical evaluation panel, as necessary.

The technical evaluation panel may rescore and re-rank technical proposals in the competitive range and prepare a technical evaluation report. To the extent practicable, the same evaluators who reviewed the original proposals shall perform the evaluation. The Contracting Officer and Project Officer shall conduct a final evaluation of past performance. The technical evaluation panel may be involved in the final evaluation of past performance, if the panel is comprised solely of Government personnel.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347