Reference

More Resources

 

Section 245.7310-2: Performance bond.

Performance bonds are required when work, other than loading, is to be performed by the purchaser and a bond is considered necessary to ensure performance. Generally, performance bonds shall be 100 percent of the estimated cost of the work to be performed. If a 100 percent performance bond would be disadvantageous to the Contractor or to the Government, the amount may be reduced to not less than

50 percent of the estimated cost of the work. Include the following condition when performance bonds are required:

PERFORMANCE BOND

Within ten days after notice of award, the Purchaser shall furnish a performance bond in the sum of $______ to cover the Purchaser's obligations. Such bond shall remain in full force and effect during the term of the contract and any extensions as may be agreed upon. The Purchaser shall not be permitted to begin performance until the bond has been received.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347