Reference

More Resources

 
FARS

Section 245.607-1: General.

    (a)(i) The contractor may request a pre-inventory scrap determination, made by the plant clearance officer after an on-site survey, if inventory is considered without value except for scrap. If approved, the contractor may make a single descriptive entry on an inventory schedule, generally describing the property and indicating its approximate total cost. The plant clearance officer will establish a plant clearance case and perform limited screening.

      (ii) If the contractor has an approved scrap procedure, routine disposal of production scrap and spoilage is authorized, and a plant clearance case is unnecessary. The contractor may similarly dispose of worn, broken, mutilated, or otherwise rejected parts from overhaul and repair contracts with the approval of the plant clearance officer.

      (iii) In addition to segregating scrap to maximize proceeds, the contractor may also consolidate sales of Government and contractor scrap if approved by the plant clearance officer. When a consolidated sale is approved, the plant clearance officer shall waive the scrap warranty required at 245.607-70.

      (iv) When a contractor's approved scrap procedure does not require physical segregation of Government and contractor scrap, the plant clearance officer shall ensure the proceeds of scrap sale are equitably distributed.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347