Reference

More Resources

 

Section 242.7202: Policy.

DoD policy is for its contractors to have an MMAS that conforms to the standards in paragraph (e) of the clause at 252.242-7004, so that the system-

    (a) Reasonably forecasts material requirements;

    (b) Ensures the costs of purchased and fabricated material charged or allocated to a contract are based on valid time-phased requirements; and

    (c) Maintains a consistent, equitable, and unbiased logic for costing of material transactions.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347