Section 234.004: Acquisition strategy.

    (1) See 209.570 for policy applicable to acquisition strategies that consider the use of lead system integrators.

    (2) In accordance with Section 818 of the National Defense Authorization Act for Fiscal Year 2007 (Pub. L. 109-364), for major defense acquisition programs as defined in 10 U.S.C. 2430-

      (i) The Milestone Decision Authority shall select, with the advice of the contracting officer, the contract type for a development program at the time of Milestone B approval or, in the case of a space program, Key Decision Point B approval;

      (ii) The basis for the contract type selection shall be documented in the acquisition strategy. The documentation-

        (A) Shall include an explanation of the level of program risk; and

        (B) If program risk is determined to be high, shall outline the steps taken to reduce program risk and the reasons for proceeding with Milestone B approval despite the high level of program risk; and

      (iii) If a cost-type contract is selected, the contract file shall include the Milestone Decision Authority’s written determination that-

        (A) The program is so complex and technically challenging that it would not be practicable to reduce program risk to a level that would permit the use of a fixed-price type contract; and

        (B) The complexity and technical challenge of the program is not the result of a failure to meet the requirements of 10 U.S.C. 2366a.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347