Section 216.405-2: Cost-plus-award-fee contracts.

    (b) Application. The cost-plus-award-fee (CPAF) contract may include provisional award fee payments. A provisional award fee payment is a payment made within an evaluation period prior to a final evaluation for that period. The contracting officer may include provisional award fee payments in a CPAF contract on a case-by-case basis, provided those payments-

      (i) Are made no more frequently than monthly;

      (ii) Are limited to no more than-

        (A) For the initial award fee evaluation period, 50 percent of the award fee available for that period; and

        (B) For subsequent award fee evaluation periods, 80 percent of the evaluation score for the prior evaluation period times the award fee available for the current period, e.g., if the contractor received 90 percent of the award fee available for the prior evaluation period, provisional payments for the current period shall not exceed 72 percent (90 percent x 80 percent) of the award fee available for the current period;

      (iii) Are superseded by an interim or final award fee evaluation for the applicable evaluation period. If provisional payments have exceeded the payment determined by the evaluation score for the applicable period, the contracting officer shall collect the debt in accordance with FAR 32.606; and

      (iv) May be discontinued, or reduced in such amounts deemed appropriate by the contracting officer, when the contracting officer determines that the contractor will not achieve a level of performance commensurate with the provisional payment. The contracting officer shall notify the contractor in writing of any discontinuance or reduction in provisional award fee payments.

    (c) Limitations.

      (i) The CPAF contract shall not be used-

        (A) To avoid-

          (1) Establishing cost-plus-fixed-fee contracts when the criteria for cost-plus-fixed-fee contracts apply; or

          (2) Developing objective targets so a cost-plus-incentive-fee contract can be used; or

        (B) For either engineering development or operational system development acquisitions that have specifications suitable for simultaneous research and development and production, except a CPAF contract may be used for individual engineering development or operational system development acquisitions ancillary to the development of a major weapon system or equipment, where-

          (1) It is more advantageous; and

          (2) The purpose of the acquisition is clearly to determine or solve specific problems associated with the major weapon system or equipment.

      (ii) Do not apply the weighted guidelines method to CPAF contracts for either the base (fixed) fee or the award fee.

      (iii) The base fee shall not exceed three percent of the estimated cost of the contract exclusive of the fee.

    (S-70) See PGI 216.405-2 for guidance on the use of CPAF contracts.