|
|
DSCR M20: FOB ORIGIN CONTRACTS FOR SUPPLIES ORIGINATING OUTSIDE THE U.S.
Deprecated: Function mysql_numrows() is deprecated in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 182
Section: M
DPACS Code: M20
BSM Code: M25F30
Clause Number: 52.225-9G10
Type: LOCAL
Clause last updated: 1996-01
|
Date of text: 1996-01 (current version)
M20 52.225-9G10 F.O.B. ORIGIN CONTRACTS FOR DSCR (JAN 1996)
AND SUPPLIES ORIGINATING OUTSIDE
M25F30 THE UNITED STATES
IF THE OFFEROR OFFERS SUPPLIES ORIGINATING OUTSIDE THE UNITED
STATES WHICH REQUIRE TRANSPORTATION BY OCEAN VESSEL, THE FOLLOWING
PROVISIONS APPLY:
(a) Inspection and acceptance will be at point of
origin. The offeror will designate one or more ports of loading
which have regular sailings of U.S. flag vessels which will meet
the required delivery dates at the overseas destinations. Supplies
shall be delivered to the port of loading at the expense of the
contractor.The Government will not be liable for any transportation,
delivery, storage, demurrage, accessorial, or other charges involved
prior to actual delivery of the supplies to the port of loading.
The Contractor will assume all responsibility and risk of loss for
supplies (1) not received at the point to which the contractor has
prepaid the transportation costs or (2) damaged in transit to such
point and will replace repair or correct such supplies promptly at
his expense, including any additional transportation charges,
provided notice of loss or damage is furnished by the Contracting
Officer within 90 days from the date of acceptance.
(b) In addition to the f.o.b. origin price of the supplies,
the price(s) will include inland transportation costs from the point of
origin to the port or ports of loading designated by the offeror, for
delivery to and placement on the carrier's wharf (free along shipside
within reach of ships loading tackle). Offers offering supplies of
foreign origin will be evaluated on the basis of the laid-down cost
to the Government at the destination(s) shown in the schedule, via a
port of loading designated by the offeror which is compatible with
required delivery dates and other military considerations. Failure
to designate a port of loading having regular sailings of U.S. flag
vessels which will meet the required delivery dates at the overseas
destination may make the bid non-responsive.
(c) When delivery to the port of loading is made by common
carrier, the contractor will state on its invoice the name of the
carrier and bill of lading number of the shipment and will furnish
therewith a receipted freight bill or, if the contractor does
not have a receipted freight bill, a copy of the unreceipted freight
bill and a copy of the carrier's invoice to him. When shipment is
made by other than common carrier, the contractor will attach to its
invoice a receipted copy of the delivery document showing receipt at
the port of loading.
(d) Provisions of FAR Clause 52.247-52, Clearance and
Documentation Requirements-Shipments to DoD Air or Water Terminal
Transshipment Points (APR 1984), incorporated herein by reference,
apply if shipment will be consigned to a DoD water terminal
transshipment point.
(e) Where the schedule provides for the designation of
The offeror's shipping point, offeror shall indicate the port
of loading used in submission of his offer.
Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 369
Fatal error: require(): Failed opening required '../../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 369
|