DSCR E8: MANUFACTURING PROCESS CONTROLS AND IN-PROCESS INSPECTIONS
Deprecated: Function mysql_numrows() is deprecated in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 182
Section: E
DPACS Code: E8
BSM Code: E46C01
Clause Number: 52.246-9001
Type: DLAD
Clause last updated: 1998-06
|
Date of text: 1997-08
E8 52.246-9001 MANUFACTURING PROCESS CONTROLS DLAD (AUG 1997)
AND IN PROCESS INSPECTIONS
This clause supplements Paragraph 4.9 (Process Controls)of
ANSI/ASQC Q9002, or equivalent standards with process controls, and
is applicable when the contract requires a higher-level quality
system in accordance with FAR 46.202-4.The contractor shall:
(a) Ensure that all manufacturing operations are carried out
under controlled conditions which will adequately assure that product
characteristics and criteria specified by contract are achieved and
maintained in the produced item. Controlled conditions include
documented process control and in-process inspection procedures,
adequate methods for identifying and handling material, adequate
production equipment and working environments.
(b) As a minimum, perform inspections (examinations and/or tests)
during manufacturing on those product characteristics which cannot be
inspected at a later stage, and ensure that process controls are
implemented and effective.
(1) Manufacturing processes shall be evaluated to determine
which process characteristics have an effect on the quality of the
produced item. These manufacturing processes shall be identified and
requirements for their control shall be specified in written process
control procedures.
(2) When in-process inspection of material is not practical,
control by monitoring processing methods, equipment, and personnel
shall be provided. Both in-process inspection and process monitoring
shall be provided when control is inadequate without both.
(3) Prompt corrective action shall be taken when noncompliance
or out of control conditions occur.
(c) Clearly identify each in-process inspection and process
control point at appropriate locations in the manufacturing operation.
(d) Prepare clear, complete, and current written procedures for:
(1) Each in process inspection. Identify: the type,
frequency, and amount (sampling plan/100 percent) of inspection;
product characteristics to be inspected; criteria for approving and
rejecting product; the record for ocumenting inspection results; and
the method for identifying the inspection status of approved and
rejected product.
(2) Each process control. Identify: the criteria,
frequency, and records used for verifying control of the process.
(3) Assessing the adequacy of in-process inspections and
process controls. The contractor's quality organization shall
assure by periodic surveillance that procedures are followed and
are effective. Records of this surveillance will be maintained.
(e) Make the documented inspection system available for review by
the Government Quality Assurance Representative prior to the initiation
of production and throughout the life of the contract. The Government is
under no legal obligation to perform verification inspection or to accept
product produced under the contract until the Government has received
acceptable written procedures, and has been afforded an opportunity to
evaluate the inspection system. Acceptance of the Contractor's inspection
system by the Government does not bind the Government to accept any non-
conforming supplies that may be produced by the contractor. Periodic
evaluations of the system may be made by the Government throughout the
life of the contract.