Reference

More Resources

 

Section 5311.390(a): Evaluation of Used and/or Overhauled Surplus Material

If used or overhauled material is acceptable, the contracting officer may insert the provision at 5352.211-9019, Evaluation of Used and/or Overhauled Surplus Material, in Section M, substantially as written.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347